Distribution Centre
Kettering, confidential client
Parogon built a new 35,000 sq ft mezzanine floor inside an operating 200,000 sq ft distribution centre: £2.4m over 16 weeks. The construction zone was sectioned off behind a temporary full-height jumbo stud partition so the client's business carried on, with civils and steel, three goods lifts, new conveyors with compressed air and fire suppression, and new sprinklers, lighting and detection.
- Client
- Confidential
- Location
- Kettering
- Value
- £2.4 million
- Construction
- 16 weeks
- Building
- 200,000 sq ft



Sealed off
A temporary full-height jumbo stud partition kept the operation dust-free.
No shutdown
A floor inside a floor
35,000 sq ft of mezzanine on new civils and steel framework.
35,000 sq ft
Moving goods
Three goods lifts and new distribution conveyors with compressed air and fire suppression.
3 lifts
Life safety
New sprinklers, high and low-level lighting and fire detection.
16 weeks

No shutdown. No dust on the pick faces. Every order went out.