LEVEL1
St Mary's Stadium, Southampton
A UK first: 12,000 sq ft inside a live stadium
A UK-first competitive socialising venue built inside a live football stadium.
View case study
About ParogonOne team. Over 20 years.Meet the people who design, build and maintain every space.Meet the teamLatest news
NewsroomProject highlights
View all projects
Sport & LeisureLEVEL1A UK first: 12,000 sq ft inside a live stadium
HealthcareWelbeckMultiple floors inside live buildings, for 400+ consultants
EducationUniversity of Law20,000 sq ft in 12 weeks, with 0 teaching days lost
CommercialEndell Street8,000 sq ft period building, designed and built by one team
HospitalityKnightwood LoungeSix boxes turned into one lounge, used seven days a weekOur work
Hospitals, prisons, stadiums, schools and workplaces, each designed, built or maintained by one Parogon team. Filter by sector to find work like yours.
St Mary's Stadium, Southampton
A UK first: 12,000 sq ft inside a live stadium
A UK-first competitive socialising venue built inside a live football stadium.
View case study →
Bristol
20,000 sq ft in 12 weeks, with 0 teaching days lost
A 20,000 sq ft campus refurbishment delivered in twelve weeks over the summer recess.
View case study →
London
Multiple floors inside live buildings, for 400+ consultants
Premium specialist healthcare spaces planned around faster patient journeys.
View case study →
Covent Garden, London
8,000 sq ft period building, designed and built by one team
A period building restored into a calm, characterful workplace people choose to use.
View case study →
St Mary's Stadium, Southampton
Six boxes turned into one lounge, used seven days a week
Six hospitality boxes brought together as one premium, flexible lounge.
View case study →
Wexham Park Hospital, Slough
£6.5m modular complex craned into a live hospital
A modular clinical complex craned into an enclosed live hospital site.
View case study →
Surrey
Mental Health Unit built in 16 weeks, designed in-house
Purpose-built secure accommodation designed and delivered for a live estate.
View case study →
London
Training restaurant inside a live prison, on schedule and on budget
A high-street-standard training restaurant delivered inside an operational prison.
View case study →Kettering
35,000 sq ft mezzanine in 16 weeks, with no shutdown
A new mezzanine delivered behind a partition while orders kept moving.
View case study →
United Kingdom
Five floors of workspace ready to move in
Five floors of colourful, practical workspace ready for the team to move in.
View case study →
Arden University
Teaching rooms and social spaces with character
Teaching rooms, social spaces and a branded welcome, built with character.
View case study →
Reading
Windows and roof replaced, NHS facility open throughout
A live NHS facility protected from persistent water ingress through phased window and roofing replacement.
View case study →
40 Bernard Street, London WC1
Shared reception, lobbies and lifts for every tenant
A shared reception and mezzanine renewed for every business in a multi-tenant building.
View case study →
Camberley, Surrey
A calmer clinical environment, reception to treatment
A calmer clinical environment connecting reception, circulation and treatment spaces.
View case study →
United Kingdom
22,000 sq ft above a live zero-dust floor, in 29 weeks
A complex curved mezzanine and new offices delivered above a live, zero-dust manufacturing operation.
View case study →
United Kingdom
10,000 sq ft in 7 weeks
An agile workplace with town hall staging, quiet booths and biophilic spaces for focused and collaborative work.
View case study →
Basingstoke
46,000 sq ft HQ handed over two weeks early
A five-floor UK headquarters delivered ahead of programme with a wide range of collaborative work settings.
View case study →
United Kingdom
Agile workplace inside a managed building
An agile workplace built around movement, collaboration and useful breakout space.
View case study →
Farnborough, Hampshire
Planned and reactive FM to HTM
Planned and reactive maintenance keeping a healthcare building safe, working and compliant.
View case study →
Eastleigh, Hampshire
Ground floor renewed for visitors and staff
A renewed ground floor that welcomes visitors and brings the team together.
View case study →
West Berkshire Community Hospital
Cancer care ward in 8 weeks, inside a live hospital
A new cancer care ward developed and fitted out within the Trust Wing of the main hospital.
View case study →
Chalvey, Slough
New-build GP hub for NHS Frimley Health
A new GP hub bringing consulting, tests and wider health services together.
View case study →
Southern England
60+ branches over 15 years
A repeatable branch programme shaped around the bank's people and customers.
View case study →
United Kingdom
Ten floors renewed in five live phases
A live head office consolidated and renewed through carefully sequenced phases.
View case study →
Derby
National training centre in 20 weeks
A national training centre combining workshops, vehicle bays, showroom, classrooms and offices.
View case study →
Frimley ICB
East wing renewed, with a bespoke café
A comprehensive ground-floor east-wing refurbishment with renewed interiors, services and a bespoke café.
View case study →
United Kingdom
Reception to boardroom for a 70+ person team
A contemporary workplace where the reception explains the business on arrival.
View case study →
United Kingdom
26,500 sq ft agile workplace in 16 weeks
A workplace strategy translated into a collaborative office built around new ways of working.
View case study →
United Kingdom
6,000 sq ft in 8 weeks
A flexible workplace centred on collaboration, hospitality and an arrival designed to make an impression.
View case study →
United Kingdom
18,000 sq ft, shell to workplace in 24 weeks
An Edwardian building transformed from shell and core into flexible, plug-and-play workplaces.
View case study →
Bordon, East Hampshire
3,000 sq ft co-working in 12 weeks
A high-finish co-working space built inside The Shed with a complete new building-services solution.
View case study →
Chelmsford
Reception and pharmacy in 12 weeks, hospital fully open
A phased reception and pharmacy refurbishment delivered while the private hospital remained fully operational.
View case study →
St Mary's Stadium, Southampton
A redundant ticket office turned into a pub
A redundant ticket office turned into a pub and social venue rooted in Southampton FC history.
View case study →
Exeter
Four floors of a former HMRC landmark in 26 weeks
Four floors of a landmark former HMRC building fitted out with completely renewed building services.
View case study →
Slough
Clinical spaces delivered around live patient services
Clinical spaces delivered around a working hospital and live patient services.
View case study →
London W1
Two W1 buildings joined in 8 weeks, fully occupied
Two buildings connected and refurbished while the legal team kept working.
View case study →Your next step
Twenty minutes is enough to talk through your space, your timing and a realistic budget. We agree scope, cost and programme up front.