Healthcare

We create beautiful healthcare spaces.

Wards, imaging suites and pharmacies rebuilt inside live NHS and private hospitals, phased around your clinics.

Trusted by NHS Frimley, Ramsay and Welbeck

Delivered by Parogon

Clinical standards. Human spaces.

Clinical standards. Human spaces.

Hospitals never close. So every Parogon healthcare project starts with the same question: what has to keep running while we build? We plan the phasing, infection control and routes first, then design spaces that feel calmer for patients and work harder for clinicians.

For over 20 years we've designed, built and maintained clinical space for NHS trusts and private providers: radiology and endoscopy, pharmacies and theatres, chemotherapy wards, GP hubs and premium outpatient centres. One team, from the first drawing to the maintenance schedule.

Curved reception desk at Camberley Health Centre, refurbished by Parogon

Why Parogon

Why NHS and private estates teams choose Parogon

One team, start to finish

We design, build and maintain. No hand-offs between contractors, so nothing gets lost.

One drawing, built exactly

You sign off one complete drawing. That drawing is what gets built, to an agreed cost and programme.

Built while care goes on

Phased around clinics, wards and theatres, with infection control from day one.

  • 20+ years: NHS, Ministry of Justice and major organisations
  • Every project manager SMSTS certified
  • Scope, cost and programme agreed up front

Asked first

Three questions estates teams ask first.

01

Can you build while our wards and clinics stay open?

Yes. We phase the works so each department hands back before the next closes. At St Peter's Hospital, Chertsey, pharmacy, theatres and maternity were handed back in turn. At NHS Surrey Downs we refurbished every public WC on site and never left the site without provision.

See St Peter's →

1 / 3

What we deliver

What we deliver for healthcare.

Recovery bay in the remodelled department at Wexham Park Hospital

Ward & department refurbishment

Phased upgrades inside live hospitals, with infection control and agreed access windows.

  • Theatres, acute medicine, paediatrics, maternity
  • Strip-out to clinical finish
  • Departments handed back in turn

Go deeper →

Imaging room at Wexham Park Hospital Radiology

Diagnostic & imaging suites

Radiology and endoscopy remodels with the services they depend on.

  • Medical gases
  • M&E, drainage and water services
  • Fire compartmentation
  • Rooftop AHUs

Go deeper →

Reception and pharmacy refurbishment at Springfield Hospital, Chelmsford

Pharmacy & reception

Front doors and pharmacies rebuilt while patients keep arriving.

  • Automated dispensing and conveyor-ready pharmacy (St Peter's)
  • Curved-glass reception and secure pharmacy in 12 weeks (Springfield Hospital, Ramsay Health Care)

Go deeper →

Chemotherapy treatment bays at the Greenham Trust Wing, West Berkshire Community Hospital

Oncology & treatment wards

Complete treatment environments inside a working hospital.

  • Serviced chemotherapy bays
  • Drug preparation room
  • Clinical treatment rooms
  • Built in 8 weeks at Greenham Trust Wing

Go deeper →

Greenwatt Way GP hub in Chalvey, Slough

Primary care & GP hubs

New-build and refurbished community care, with more services under one roof.

  • Consulting and HCA rooms
  • Space for scans and tests
  • New build from groundworks (Greenwatt Way, Chalvey)

Go deeper →

Clinical modules landing on site at Wexham Park Hospital

Modular clinical buildings

Factory-built clinical complexes craned onto busy sites.

  • Endoscopy Complex, Wexham Park: £6.5m, 44 weeks
  • Modules landed one at a time inside the hospital boundary

Go deeper →

Interior of the new building at HMP Bronzefield

Mental health & secure units

Ligature-safe, anti-barricade environments built to NHS and MoJ standards.

  • HMP Bronzefield Mental Health Unit, designed in-house and built in 16 weeks

Go deeper →

Farnborough Centre for Health building exterior

FM to HTM

Planned maintenance and emergency call-outs from the team that built it.

  • Installed plant maintained to HTM directives at Farnborough Centre for Health

Go deeper →

  1. 01Ward & department refurbishment
  2. 02Diagnostic & imaging suites
  3. 03Pharmacy & reception
  4. 04Oncology & treatment wards
  5. 05Primary care & GP hubs
  6. 06Modular clinical buildings
  7. 07Mental health & secure units
  8. 08FM to HTM

How we work · One team, start to finish

How we work: Design, Build, Maintain

  1. 01

    Design

    We plan around patient flow and clinical sessions, so layouts shorten journeys and services never stop. You sign off one complete drawing.

  2. 02

    Build

    One accountable project manager runs the site inside your hospital: phased around imaging lists, procedures and wards, with dust, noise and routes controlled.

  3. 03

    Maintain

    Our FM team maintains what we built to HTM directives, with one call when something needs fixing.

How we work →
Bright hospital corridor with timber accents, sage green walls and daylight

Clinical standards. Human spaces.

Welbeck Health reception lounge with warm timber, natural stone and soft light

Flagship project · Private healthcare · London

Welbeck Health

Multiple floors · Reception, consultation, imaging and day-case recovery

consultants
400+
consultants
specialist centres
21
specialist centres
buildings throughout
Live
buildings throughout

The brief

One of the UK's largest specialist outpatient providers, with 400+ consultants across 21 specialist centres. Welbeck asked Parogon to design and fit out multiple floors, from flagship reception and consultation suites to diagnostic imaging and day-case recovery, all inside clinically active buildings.

What we did

  • Premium arrival

    A hospitality-grade reception with warm timber, natural stone and soft light.

  • Faster journeys

    Consultation, diagnostics and treatment placed close together, with fewer trips between floors.

  • Clinical precision

    Imaging off the clinical corridor; private day-case recovery rooms.

  • Services never stopped

    Phased around consulting sessions, imaging lists and day-case procedures.

The result

0
clinics closed to deliver it
Multiple
floors designed and fitted out

Tap the photos to flick through Welbeck.

Read the full case study →
Department corridor at Wexham Park Hospital

Deep dive

Building inside a live hospital

A hospital is a 24-hour building. We plan every stage around patients, clinicians and operations: routes kept open, dust and noise controlled, isolations booked, and each area handed back before the next is taken.

  • Infection control from day one
  • Phased handovers by department (St Peter's)
  • Public facilities never removed (NHS Surrey Downs, every public WC)
  • Envelope works on an occupied building with sectional scaffolding (Bath Road, Reading)
Crane lifting a clinical module between hospital buildings at Wexham Park

Deep dive

Finding capacity on a full site

When there's no room to spare, we look for the space the building forgot, or build it offsite.

  • Royal Berkshire: two lightwell infills linked back by new corridors, with underfloor heating and clinical finishes
  • Wexham Park: a modular Endoscopy Complex, with every crane lift sequenced up front
Modular clinical buildings →
Treatment bay at Wexham Park Hospital

Deep dive

Clinical services, done properly

Clinical spaces are only as good as the services behind the walls.

  • Medical gases, M&E, drainage and water services (Wexham Radiology)
  • Fire compartmentation and rooftop AHUs
  • HVAC and BMS integration (King Edward VII)
  • Pharmacy planned around automated input, refrigeration, labelling and conveyors (St Peter's)
Private patient lounge at Springfield Hospital

Deep dive

Private healthcare that feels like hospitality

Patients who choose private care expect the setting to match. We bring hotel-grade arrival and finishes to clinical layouts.

  • Welbeck's timber, stone and soft light
  • Springfield's low-iron curved-glass reception and private patient lounge
See Welbeck Health →

Inside the spaces we've built

Treatment room at Camberley Health Centre
A treatment room ready for daily care, Camberley
Reception screen in glass and brushed metal at Camberley Health Centre
Reception detail, Camberley
Open sightlines between reception and treatment rooms at Camberley
Open sightlines, Camberley
Waiting area with mural at Wexham Park Radiology
A calmer waiting area, Wexham Park
Corridor with mural at Wexham Park Hospital
A brighter corridor, Wexham Park
Clinical room inside the modular Endoscopy Complex
Inside the Endoscopy Complex
Greenwatt Way GP hub site seen from above
Greenwatt Way from above
Ground-floor east wing at King Edward VII Hospital
East wing, King Edward VII
Bespoke café at King Edward VII Hospital
The café, King Edward VII
Cancer care ward at the Greenham Trust Wing
Cancer care ward, Greenham Trust Wing
Day recovery fit-out in progress on Wigmore Street, London
Wigmore Street (in progress)

FAQs

Healthcare refurbishment FAQs

Can you refurbish a hospital department while it stays open?

Yes. We phase works by department and hand each area back before the next closes. St Peter's Hospital, Chertsey handed back pharmacy, theatres and maternity in turn, and Springfield Hospital's reception and pharmacy were rebuilt in 12 weeks while the hospital stayed fully operational.

Do you build to HTM standards?

Yes. Our Wexham Park Radiology remodel included new medical gases, M&E, fire compartmentation and a rooftop air handling unit, delivered on time and on budget. Our FM team maintains installed plant to HTM directives at Farnborough Centre for Health.

How do you manage infection control and disruption on a live site?

We plan routes, dust and noise control, and access windows with your estates and infection prevention teams before work starts, and keep public and clinical routes open throughout. At NHS Surrey Downs, every public WC was refurbished without removing provision.

We have no spare space. Can you still add clinical capacity?

Often, yes. We turned two redundant lightwell courtyards at Royal Berkshire Hospital into a Major Incident Room and Bed Management Suite, and at Wexham Park we craned a £6.5m modular Endoscopy Complex onto an enclosed live site in 44 weeks.

Do you work for private providers as well as the NHS?

Yes. We've delivered premium outpatient floors for Welbeck Health and a reception and pharmacy for Ramsay Health Care at Springfield Hospital. We also work with NHS trusts and ICBs, including NHS Frimley.

Can you maintain the space after handover?

Yes. Our FM team provides planned maintenance and emergency call-outs, maintaining plant to HTM directives. The people who built the space keep it working.

Anthony Mukabaa, owner of Parogon
“We built Parogon to take care of a project from the first sketch to long after handover.”
Anthony Mukabaa · Owner, Parogon
Read Macca's letter →

Your next step

Building for care, without disrupting it.

Tell us the ward, suite or clinic and what must stay open. We agree scope, cost and programme up front.

20+
Years in healthcare
NHS
Trusted partner
Live
Clinical-environment delivery
HTM
Compliant delivery

or call 01483 799433