
Clinical space, craned in and working
Medical Pods & Systems
Consulting, treatment and triage pods, up to full clinical complexes, built offsite.
Overview
Built offsite, installed on yours
Medical pods bring clinical space to site as complete, commissioned units: consulting and treatment rooms, triage and assessment units, washrooms and utility pods. Each is built under factory quality control with impervious finishes, HTM-compliant ventilation and full M&E, then craned in and connected in days. At Wexham Park we scaled the same approach to a £6.5m Endoscopy Complex, landed one module at a time on a live hospital site.
What we build
Pod types in this range
Consulting & treatment pods
Fully fitted clinical rooms with sanitary, data and clinical services.
Diagnostic & screening pods
Serviced enclosures for screening and diagnostic equipment.
Triage & assessment units
Rapid-deploy capacity for surge, outreach and community clinics.
Clinical washroom & utility pods
Seamless GRP wet areas, sluice rooms and clean utility spaces.
Range of options
Medical Pods & Systems: design options
Every pod is built around the same three standard footprints — 10ft, 20ft and 40ft — while the structure, cladding, glazing and interior are tailored to the setting. These examples show the range of looks achievable in this sector. Design options from our range. Ask to see delivered examples.






Construction options
What these pods can be built from
GRP & composite pods
Moulded, seamless composite shells for wet rooms, washrooms and clinical spaces needing an impervious, easy-clean finish.
Steel-framed volumetric
Hot-rolled and light-gauge steel frames for heavy-duty, stackable modules where spans, loadings or fire strategy demand it.
Converted shipping containers
20ft and 40ft ISO containers stripped, insulated, clad and fitted out, robust, relocatable and fast to deploy.
Explore more
Other pod sectors
Questions
Medical Pods & Systems: FAQs
Are medical pods HTM compliant?
Yes. Medical pods have HTM-compliant ventilation and are built to the same regulations as conventional construction.
Can pods go onto a live hospital site?
Yes. At Wexham Park Hospital we landed a £6.5m modular Endoscopy Complex one module at a time inside an enclosed, live site.
Can you maintain them after handover?
Yes. Our FM team maintains installed plant to HTM directives, as at Farnborough Centre for Health.
Your next step
Short of space and short of time?
Tap through four quick steps and watch your project take shape, or book a 20-minute call with the team.
or call 01483 799433
20+ years NHS & Ministry of Justice partner Scope, cost and programme agreed up front



















