
Education · Schools, colleges & universities
Calm spaces to learn.
Ready for day one of term.
Classrooms, SEND provision, libraries and campuses, designed and built by one team around your term dates, then cared for after handover.
What we do for schools, colleges and universities
We design it, build it and look after it. One team throughout.
01
Design
We walk the site with your SENCO and estates team, agree pupils, spaces and budget, then you sign off one complete drawing at an agreed cost and programme.
- Site survey and brief
- Layouts, sensory features and finishes
- One drawing, one agreed cost
02
Build
Fixed builds, refurbishments and offsite pods, phased around your school day with a segregated compound, separate access and vetted teams.
- New classrooms, halls and extensions
- Refurbishment while you stay open
- Pods craned in and commissioned in days
03
Maintain
Our facilities management team keeps buildings and pitches safe and compliant all year, so the space still works long after handover.
- Planned and reactive maintenance
- Pitches, MUGAs and courts
- Safe and compliant all year
Any month of the year
We work to your dates, not the other way round.
Starting in term time
On-site work is phased around the school day, with a fenced compound, separate access and deliveries timed away from drop-off and pick-up. Pods are built offsite while you teach.
Using a holiday
The noisiest work and installs move into half terms, Easter or summer. The University of Law’s 20,000 sq ft campus was delivered in one 12-week recess.
Real spaces. Real projects.
Inside our education work

Study pods and branded social space at the University of Law, Bristol · 1 / 4
University of Law · Bristol
A whole campus. Ready for term.
A reception, café point, breakout space, study pods, quiet rooms and a floor-to-ceiling living wall, all ready before the first lecture of term.
- sq ft
- 20,000
- weeks over recess
- 12
- teaching days lost
- 0

Arden University
Teaching rooms, social spaces and a branded welcome, built with character.
What would you like to create?
One estate. Many possibilities.
From early years to university. SEND and inclusive provision are part of our education work, alongside teaching, sport and social spaces.

Room to learn. Space to grow.
Classrooms, halls and extensions, built on site or offsite in timber, steel or containers, craned in over a holiday.
The Parogon approach
Your people first.
One team throughout.
01
Design around the day
With your staff, SENCO and pupils, from layout to safeguarding.
02
Build around the calendar
In the holidays or phased around term time, with segregated compounds.
03
Care beyond handover
Our FM team keeps buildings and pitches safe and compliant all year.
Before we begin
Your questions,
answered.
Can you build it without losing a teaching day?
Programmes are fixed to your term dates, with long-lead items ordered early. The University of Law's 20,000 sq ft campus took one 12-week recess.
How will you keep pupils safe while you're on site?
Segregated compounds, separate site access, deliveries timed away from drop-off and pick-up, and vetted teams who understand safeguarding.
Can we add SEND places without losing a classroom?
Sensory, calm and 1:1 pods are built offsite during term, then craned in and commissioned in days, usually within a single holiday.
What about planning permission?
It depends on size, location and how long the building will stay. We check the requirements and manage applications and building regulations as part of the project.
Your next space
Ready when your school needs it.
Starting in January, at Easter or for September, tell us the space and your dates. We plan the programme around them. Four short steps, then a real conversation with our team. No commitment.







