Crane lifting a clinical module between hospital buildings at Wexham Park

Pods & Modular

We create beautiful pod spaces.

Clinic rooms, classrooms and secure units in 10, 20 and 40ft modules, built offsite and connected in days.

Trusted by NHS and Ministry of Justice clients

Delivered by Parogon

Craned in. Connected. Working.

Craned in. Connected. Working.

Short of space and short of time? Modules are built offsite while your groundworks run, then craned in and connected in days, not months. Less time on site means less disruption for the hospital, school or prison around it.

We design the unit, the base and the services around your site, use and regulations; we build and install it; and our FM team maintains it for years. Seven pod ranges, one standard: built to the same regulations as conventional construction.

Modules landing one at a time at Wexham Park Hospital

Why Parogon

Why build modular with Parogon

One team, start to finish

We design, build and maintain. No hand-offs between contractors, so nothing gets lost.

One drawing, built exactly

You sign off one complete drawing. That drawing is what gets built, to an agreed cost and programme.

Days on site, not months

Built offsite while your groundworks run, then craned in and connected.

  • 20+ years: NHS, Ministry of Justice and major organisations
  • Every project manager SMSTS certified
  • Scope, cost and programme agreed up front

Asked first

Three questions estates teams ask before going modular.

01

How fast can we open the doors?

Modules are built while your groundworks run, then craned in and connected in days, not months.

1 / 3

What we deliver

Seven pod ranges, one standard.

How we work · One team, start to finish

How we work: Design, Build, Maintain

  1. 01

    Design

    We survey the site, use, services and regulations, then design the unit and its base. You sign off one complete drawing.

  2. 02

    Build

    Modules are made offsite while groundworks run, then craned in, connected and commissioned in days.

  3. 03

    Maintain

    Our FM team maintains the pods and their services, so they keep working for years.

How we work →
Timber-lined container classroom in a woodland setting, design option

Craned in. Connected. Working.

Modular Endoscopy Complex in position at Wexham Park Hospital

Flagship project · Modular clinical complex · Slough

Endoscopy Complex, Wexham Park

A modular clinical complex craned onto an enclosed live hospital site

project value
£6.5m
project value
weeks of construction
44
weeks of construction
Frimley Health
NHS
Frimley Health

The brief

A new endoscopy complex for NHS Frimley Health on a hospital site with no spare room, alongside refurbished clinical areas, run by one team.

What we did

  • Plan the lifts first

    Every crane lift was sequenced up front: what lands when, and what it swings over.

  • One module at a time

    Each module landed separately, inside the hospital boundary.

  • A live, enclosed site

    Deliveries were timed around ambulances, patients and staff.

  • Refurbishment too

    Clinical areas in the main hospital were refurbished in the same programme.

The result

1
purpose-built Endoscopy complex on a site with no room for one
44
weeks of construction

Tap the photos to flick through the project.

Read the full case study →
10, 20 and 40ft pod footprints compared

Deep dive

10, 20 and 40ft: choose your footprint

Every pod starts from one of three standard footprints. Structure, cladding, glazing and interior are tailored to the setting.

Deep dive

Six ways to build. One team runs it.

Timber-framed pod, design option

Timber-framed

Engineered timber cassettes; warm, sustainable, quick to erect.

Steel-framed volumetric unit, design option

Steel-framed volumetric

Hot-rolled and light-gauge steel for heavy-duty, stackable modules.

Converted container kiosk, design option

Converted containers

20 and 40ft containers, insulated, clad and fitted out, as at HMP Winchester.

Composite clinical pod, design option

GRP & composite

Moulded, seamless shells for wet rooms, washrooms and clinical spaces.

SIPs panel garden pod, design option

SIPs panels

Structural insulated panels that keep heat in and draughts out.

Hybrid modular classroom, design option

Hybrid & bespoke

Timber, steel and container bases combined in one scheme.

Medical pod being prepared for installation, design option

Deep dive

How a modular programme runs

Two things happen at once: groundworks on site, modules in manufacture. Flexible finance options are available. Ask us when you enquire.

  • 1. Survey & design: site, use, services and regulations, signed off as one drawing
  • 2. Groundworks on site, modules in manufacture: both in parallel
  • 3. Lift day: every crane lift sequenced up front
  • 4. Connect & commission: services connected, tested and handed over
  • 5. Maintain: our FM team keeps the pods and their services working

Design options across the range

Medical pod, design option
Medical pod, design option
Clinical pod interior, design option
Clinical pod interior, design option
Treatment pod, design option
Treatment pod, design option
Classroom pod, design option
Classroom pod, design option
SEND and calm pod, design option
SEND and calm pod, design option
Study pod, design option
Study pod, design option
Multi-cell layout concept, design option
Multi-cell layout concept, design option
Changing pavilion, design option
Changing pavilion, design option
Sports pod, design option
Sports pod, design option
Container bar, design option
Container bar, design option
Hospitality kiosk, design option
Hospitality kiosk, design option
Garden studio, design option
Garden studio, design option

FAQs

Modular buildings FAQs

How quickly can a modular building be installed?

Modules are manufactured while your groundworks run, then craned in and connected in days rather than months. Your overall programme depends on design, approvals and groundworks, which we agree up front.

Are modular buildings built to the same standards as traditional buildings?

Yes, they're built to the same regulations as conventional construction. Medical pods have HTM-compliant ventilation, and education pods meet the DfE output specification.

What sizes do your pods come in?

Three standard footprints, 10, 20 and 40ft, combined into larger buildings where needed. Structure, cladding, glazing and interiors are tailored to each site.

Can you install a modular building on a live hospital or school site?

Yes. At Wexham Park Hospital we landed a modular Endoscopy Complex one module at a time inside an enclosed, live site, with ambulances, patients and staff moving throughout.

What can pods be built from?

Timber frame, steel-framed volumetric, converted shipping containers, GRP and composite, SIPs panels, or a hybrid. We recommend the build to suit the use, the site and the budget.

Do I need planning permission for a modular building?

Often, yes, as with any building. Some smaller or temporary units may fall under permitted development. We check planning and building regulations with you at design stage, before anything is made.

Anthony Mukabaa, owner of Parogon
“We built Parogon to take care of a project from the first sketch to long after handover.”
Anthony Mukabaa · Owner, Parogon
Read Macca's letter →

Your next step

Short of space and short of time?

Tell us about the site and the use. We'll recommend the range and the build, with flexible finance options.

3 sizes
Standard footprints
Offsite
Quality-controlled build
Low
Site disruption
20+
Years of delivery

or call 01483 799433