The completed new building at HMP Bronzefield

HMP Bronzefield

HMP Bronzefield

At HMP Bronzefield, Parogon designed and built a new Mental Health Unit in 16 weeks and delivered a 235 m² extension to an office building within the prison grounds. Both were built inside an operational prison, within its security procedures, and finished with robust fixtures and fittings made to last. Both were finished on programme and within budget.

Client
HMP Bronzefield
Project 1
Mental Health Unit, 16 weeks
Project 2
DHU extension, 235 m²
Design
Parogon in-house
Value
Confidential
Steel portal frame under construction at HMP Bronzefield
Steel portal frame going up.
Groundworks at HMP Bronzefield
Groundworks inside the secure perimeter.
New masonry elevation at HMP Bronzefield
Robust masonry construction.

Secure site

Delivered inside an operational prison, within its security procedures and routines.

Inside the wire

In-house design

The Mental Health Unit was designed by Parogon's own design team.

Design and build

Planning

Worked closely with local authority planning officers to maximise usable floor space.

More usable space

Built to last

Steel frame, cavity masonry and robust fixtures and fittings.

16 weeks

Completed interior at HMP Bronzefield
Inside: bright, robust and practical.
Built inside the wire. Built to last.

Secure environments