
HMP Bronzefield
HMP Bronzefield
At HMP Bronzefield, Parogon designed and built a new Mental Health Unit in 16 weeks and delivered a 235 m² extension to an office building within the prison grounds. Both were built inside an operational prison, within its security procedures, and finished with robust fixtures and fittings made to last. Both were finished on programme and within budget.
- Client
- HMP Bronzefield
- Project 1
- Mental Health Unit, 16 weeks
- Project 2
- DHU extension, 235 m²
- Design
- Parogon in-house
- Value
- Confidential



Secure site
Delivered inside an operational prison, within its security procedures and routines.
Inside the wire
In-house design
The Mental Health Unit was designed by Parogon's own design team.
Design and build
Planning
Worked closely with local authority planning officers to maximise usable floor space.
More usable space
Built to last
Steel frame, cavity masonry and robust fixtures and fittings.
16 weeks

Built inside the wire. Built to last.
Secure environments
Need a contractor who can work inside a secure estate?
Parogon delivers construction and fit-out inside operational prisons, to the rules the estate runs on.
Talk to Parogon